Annual report to tenants 2025/26

Housing quality, maintenance and improvements

These standards are about the quality and condition of your home. The charter expects landlords to provide homes that meet the required standards and to carry out repairs and improvements when needed.

Our performance

Indicator 2023/24 2024/25 2025/26 LA average Scotland average
Homes meeting the Scottish Housing Quality Standard 52.7% 63.3% 75.7% 86.5% 89.5%
Tenants satisfied with the quality of their home 81.6% 70.2% 70.2% 82.3% 86.6%
Average time to complete emergency repairs (hours) 5.3 4.69 5.04 3.6 3.5
Average time to complete non-emergency repairs (working days) 13.18 12.33 11.8 9.4 8.8
Reactive repairs completed right first time 76.9% 82.4% 99.5% 93.6% 95.3%
Tenants satisfied with the repair service 60.9% 69.8% 69.8% 88.1% 88.1%
Average time to resolve cases of damp and mould (working days) Not available Not available 38.63 31.43 25.75
Percentage of cases of damp or mould resolved that were reopened Not available Not available 0.8% 7.9% 8.3%
Number of times gas safety checks not met 2207 28 32 74 449

Improving the quality of our homes

The proportion of Council homes meeting the Scottish Housing Quality Standard (SHQS) improved from 52.7% in 2023/24 to 63.3% in 2024/25 and 75.7% in 2025/26. However, our performance remains below the Scottish Local Authority average of 86.5% and the Scotland average of 89.5%.

Our Housing Revenue Account Capital programme is supporting major investment in existing homes, including work to improve the condition, safety and energy efficiency of our multi-storey blocks.

The work needed varies between buildings and can include insulation, windows and roofs, heating and ventilation, electrical systems, lifts, water and waste pipes, fire-safety measures and improvements to entrances and shared spaces.

Our Mixed Tenure Improvement Service (MTIS) also carries out major repairs and improvements to buildings where ownership is shared between the Council and private owners. The work aims to bring buildings back to a good state of repair, making homes safer, warmer and more comfortable and helping to prevent further deterioration.

Find out more about improvements to mixed-tenure homes.

Repairs and maintenance

The average time taken to complete non-emergency repairs improved for the third consecutive year, falling to 11.8 working days in 2025/26. This was greater than the Scottish Local Authority average of 9.4 days.

Emergency repairs took an average of 5.04 hours, compared with 4.69 hours the previous year and a Scottish Local Authority average of 3.6 hours.

There was a substantial improvement in repairs completed right first time, increasing from 82.4% in 2024/25 to 99.5% in 2025/26.

Reported tenant satisfaction with the repairs service was at 69.8%, below the Scotland average. As with the other satisfaction measures in this report, the results of our summer 2026 tenant survey will be reflected in next year's report.

A dedicated Complaints Resolution team is already in place within housing to help resolve and analyse complaints about repairs.

To further improve the repairs service during 2025/26 we continued to build our in-house repairs capacity. Recruitment activity increased the workforce by 20 craft operatives, while the apprentice programme grew from 16 to 22 apprentices.

Find out more about Council house repairs.

Tackling damp and mould

The average time taken to resolve a damp or mould case in 2025/26 was 38.63 working days, compared with the Scottish Local Authority average of 32.91 days. However, only 0.8% of resolved cases were reopened, compared with 7.9% across Scottish local authorities and 8.3% across all Scottish social landlords. Although cases took longer to resolve on average, relatively few required further work after they had been closed.

A dedicated Preservation team is in place to manage damp and mould cases. The team has also been preparing for new statutory requirements on investigating hazards and starting repairs, that came into force from October 2026.

Keeping homes safe

Compliance with Electrical Installation Condition Reports (EICRs) increased from 79% in 2024/25 to 94% in 2025/26, with further improvement in more recent months. There were 32 occasions in 2025/26 where the annual gas safety service was not completed within 12 months, representing a compliance rate of over 99%.

Our Tenant Safety team, established in 2025, brings together experienced managers covering preservation, gas, water quality and asbestos and mechanical and electrical. This has brought greater focus and expertise to tenant safety, with work continuing to improve performance, data quality, procedures and operational practices.

Fire safety is a major part of our investment in Edinburgh's 44 multi-storey blocks. The work required varies between buildings and includes measures such as fire doors, fire stopping and sprinkler systems, alongside improvements to electrical and other building systems. Surveys and fire-safety assessments are used to identify the work required in individual blocks. This forms part of our wider programme to improve the safety, condition and energy efficiency of our multi-storey homes.

Find out more about our multi-storey improvement programme.